Industry analysts estimate that half of the commercial rooftop HVAC equipment in the U.S. is outdated, exceeding the 15- to 20-year lifespan recommended by ASHRAE. Replacing such systems offers benefits like enhanced energy efficiency, reduced utility costs, improved reliability, superior indoor air quality, and modern features like smart controls. Additionally, these upgrades qualify for utility provider incentives.
The school engaged a leading design/build performance contractor, with PremiStar as its mechanical contractor. Zach Glover, PremiStar’s VP of Construction, collaborated with the school facilities manager and performance contractor on each stage of the project, from assessment and system design to equipment selection, permitting, scheduling, installation, testing, and commissioning.
Following the planning and design phase, the PremiStar team began coordination of the complex logistics involved in the installation process. On June 25th, four semi-trucks transported the HVAC units to the school parking lot. A team of 24 technicians, using a heavy-lift construction helicopter, successfully installed 39 new units and removed the old units in 90 minutes, efficiently managing both installation and removal to minimize project costs. Over the following two weeks, the team replaced ductwork, connected electrical and gas services, and performed start-up and commissioning.
Installation of the new, ultra-high-efficiency rooftop HVAC units and associated system upgrades resulted in the following benefits:
This project highlights the significant advantages of updating HVAC systems, demonstrating how strategic planning and collaboration with leading partners can yield substantial energy efficiency and financial savings while improving building comfort, indoor air quality, and compliance with environmental regulations.